This is the supplier profile page of FORRESU FEDERICO, where buyers can explore products, connect directly with the supplier for pricing inquiries.
Italy
1.1
PIAZZA RINASCITA, 24
Add Favorite
Report Supplier
Is this your business?
Claim your business to verify your account, connect with buyers and manage your profile.
Business Description
Parco Verde is an exclusive project conceived and promoted by Dott. Federico Forresu and Italcrea srl with the scope to convert waste to green energy. Through a Romanian, Italian and Chinese professional team and with the support of the most reliable engineering companies based in Romania, Italcrea represents, on a exclusive basis, and coordinates the most important industries on renewable energy and environment protection fields. Italcrea promotes an original and unique integrated project in favor of Governments and Private investors, capable to solve at the same time, the two main needs of the nowadays societies: energy and environment protection through converting of MSW, industrial waste and agro-forestry waste into clean power and reusable products. "Parco Verde" helps to enhance and enrich the territory both in environment and economical terms, building employment (100 jobs each 300TPD plant) and energy independency. The projects has engaged an international team of manufactures of industrial systems, each one specialized on its own field, with over 20 years experience, coordinated by Italcrea. Parco Verde is an integrated, efficient and friendly-management system capable to face all the international competitors. In fact the present competitors may only offer huge all-encompassing incinerators, gasification or plasma systems which require long terms of construction over 40 months, high investment costs, high operating costs, 50% self-power consumption and very long (or impossible) pay-back time. Besides, since the above competitors' systems work on > 1200 C temperatures, those are easy to produce non-tolerant odors and air emission not easy to be controlled. Compared with them, Parco Verde construction requires only 8 months, costs 4 times less both for the initial investment and for the operating management, consumes only 15PER CENT of the power generated, guarantees 36 months pay-back period and the most important fully respects the environment.
Trade Capabilities
Business Terms
Preferred Payment Term:
Not specified
Preferred Trade Term:
Not specified
Port Of Loading:
Not specified
Accepted Currency:
USD
Trade Ability
Annual Revenue Amount:
Not specified
Numbers Of Employees:
Not specified
Avg Response Time:
-


